• Uncategorised

    It’s been a quiet few months here at Christ Church. Karl has been working on the roof of the boys bedrooms, insulating and putting down boards. This will then have a rubber flooring and become an attic/play area. My days fly by with caring for the boys. Victor is doing very well and he is an absolute delight. Maternity leave…

  • Uncategorised

    Our new arrival…

    Victor Charles arrived safely on 2nd August. He was born here at Christ Church! He has settled into Christ Church life very well. Restoration works have taken a back seat for a while due to us all spending our days getting to know the little fellow and trying to catch up on some sleep. However we need to pick up…

  • Uncategorised

    This year’s Open Days as part of Welshpool Town Council’s ‘Be a Local Tourist Week’ were a huge success. Thank you so much to everyone who came to visit us, over 160! It’s lovely to see familiar faces from previous years and the support is very uplifting. It is also so interesting meeting new people, some with a personal connection…

  • Uncategorised

    Open Days

    We have again been invited by Welshpool Town Council to open Christ Church for the public to view its interior as part of the annual ‘Be a Local Tourist Week’. This has previously been a great success for us as it is always uplifting to talk about our work here and to hear peoples reactions about the beauty of the…

  • Uncategorised

    Out of the ground!

    Saturday was a landmark day. It marked the end of what seemed like endless digging out of earth inside the church to create this house. It marked the end of having a digger in the ‘living room’ (after 4 years!). It marked the end of picking our way over boards to get to the bathroom and kitchen sink. Saturday was…

  • Uncategorised

    A little bit open…

    During this lovely spell of spring sunshine, we have the church doors open to warm up the chilled air after the winter. Inevitably a church with open doors will draw in people! Therefore we have now dedicated the porch area for passing visitors to view the works from a safe distance and read about some of the work we have…

  • Uncategorised

    Solid walls!

    Karl has been working so hard on the house during the record breaking freezing cold temperatures in the church. I can hardly bear to be out there but most evenings Karl somehow manages it, and after being at work all day. Stud walls are now made solid with plasterboard. The bedrooms are beginning to feel like proper rooms. The first…

  • Uncategorised

    Season’s Greetings

    It’s late on Christmas Eve but wanted to take this opportunity to wish all the very best of the Season’s Greetings from a very snowy Christ Church. The house build has progressed over the last few weeks with flooring and stud walls appearing upstairs. It’s amazing as you can really make sense of the layout and see the shape of…

  • Uncategorised

    Back to plastering

    After a long delay, have finally got back into plastering mode. Need to put the lime finishing coat onto the original lime plaster. We had to scrape the original masonry paint off as the walls weren’t able to breathe and consequently the original lime final coat came off with the paint. The priority is to work on the wall of…

  • Uncategorised

    Drainage works complete!

    Hurrah….at last, the epic rainwater drainage works are virtually complete. After months of toil and for the first time in over 30 years all the rainwater is now being channeled away from the church. We have installed two large soakaways and have weaved our way through the graveyard with a web of pipework linking the gullies with the soakaways. We…